What we check, and what we do not have.
Most supplier pages list certificates and stop. A certificate says the process is written down. It does not say what came off the line this week. This page covers both, including the parts we cannot answer.
Thirteen checks, in order
The list follows the product. Not every model gets every check, and the exact set is agreed per order and printed on the inspection sheet. What does not change is where the checks happen: on the line and in the lab beside it, before the carton is taped.
Incoming
In process
Finishing
Before the carton
The equipment
Six instruments do most of the work. All of them are in the Dongguan plant, and all of them are ours, not a lab we send samples to.
Certificates
Four management system certificates, all current, issued by Zhongbiaoyan Guolian (Beijing) Certification. The scope on each one is plastic mold and injection molded parts, phone cases.
Where a certificate stops
A system certificate covers how the plant is run. It is not a test report for a phone case. Buyers mix the two up, and then a purchase order is held at customs over a document that was never the right one.
What we do hold: material level RoHS, halogen free and REACH statements from the compound suppliers, dated 2023. They cover the resin as delivered, and they name the grade. Ask for the file and we send it with the model it applies to.
What that does not cover: the finished case. A molded part has pigment, plating, an adhesive and a magnet that the resin report says nothing about. A finished part report is run per model and per color, and it is paid per test.
What we do not have
CE and FCC. We do not hold our own reports. Phone cases do not need them. The models with electronics, such as the screen case, do, and the test is run per order with the cost inside the quote. Do not assume a file exists.
GRS. Our GRS certificate lapsed in June 2026. If your program needs a recycled content claim, tell us before you specify it, and we can tell you what we can and cannot support. A certificate alone would not cover a shipment either, because recycled content needs a transaction certificate per batch.
SMETA. The four pillar audit was completed on 31 July 2025 and the cycle is twelve months. The 2025 report raised three findings, on electrical safety, social insurance and overtime. Ask for the report and where those three stand now, not the report on its own.
EU GPSR. Regulation (EU) 2023/988 applies since 13 December 2024 and requires a responsible person inside the EU. We do not appoint one on our own. For an EU program the importer usually carries that role, and we supply the technical file it needs.
If you need a document for a model
Send the model, the market and the standard. We answer with one of three things: the file exists and here it is, the file does not exist and here is what it costs to run, or the file does not exist and we cannot get it in your timeline. The third answer is the one that saves a shipment.